Charges for new Construction / repair of Vessel (Effective on 1 April 2016)

Item

No

Particulars

Charges (Kyat)

Theinbyu Dock-yard

Setsun Drydock

Angyi Dock-yard

Dagon(Seikan) Dock-yard

1.

Site Preparation Charge

Ks-50/Length (ft) x Width (ft)

Ks-50/Length (ft) x Width (ft)

Ks-50/Length (ft) x Width (ft)

Ks-50/Length (ft) x Width (ft)

2.

Block Usage Charge

Ks-1500/ block - month (Block provided by MPA)

Ks-700/ block - month (Block provided by Owner)

Ks-1500/ block - month (Block provided by MPA)

Ks-700/ block - month (Block provided by Owner)

Ks-1500/ block - month (Block provided by MPA)

Ks-700/ block - month (Block provided by Owner)

Ks-1500/ block - month (Block provided by MPA)

Ks-700/ block - month (Block provided by Owner)

3.

Site Charge  

Ks-150 /ft - Day

Ks-150 /ft - Day

Ks-150 /ft - Day

Ks-150 /ft - Day

4.

Carriage Charge  

Ks-250 /ft - Day

-

Ks-250 /ft - Day

-

5.

Charge for Usage of Slipway Carriage & Winch house

Ks -250,000/ for docking

Ks -250,000/ for undocking

-

Ks -250,000/ for docking

Ks -250,000/ for undocking

-

6.

Drydock Charge

-

Ks-500/ft-Day

-

-

 

 

Item

No

Particulars

Charges (Kyat)

Theinbyu Dock-yard

Setsun Drydock

Angyi Dock-yard

Dagon(Seikan) Dock-yard

7.

Along  side Charge

Ks-80/ft - Day

Ks-80/ft - Day

Ks-80/ft - Day

Ks-80/ft - Day

8.

Side slip Charge

Ks-200 / Ton - ft

Ks-200 / Ton - ft

Ks-200 / Ton - ft

Ks-200 / Ton - ft

9.

Material storage Charge

Ks-500/m2 - Month

Ks-500/m2 - Month

Ks-500/m2 - Month

Ks-500/m2 - Month

10.

Electricity Charge for transformer  used

Ks-40,000/Ton

(1 Ton x 320 unit x kyat 125)

(10,001 unit to 50,000 unit)

Ks-40,000/Ton

(1 Ton x 320 unit x kyat 125)

(10,001 unit to 50,000 unit)

Ks-40,000/Ton

(1 Ton x 320 unit x kyat 125)

(10,001 unit to 50,000 unit)

Ks-40,000/Ton

(1 Ton x 320 unit x kyat 125)

(10,001 unit to 50,000 unit)

11.

Supervision Charge on Tonnage

Ks-9,000 / Ton

Ks-9,000 / Ton

Ks-9,000 / Ton

Ks-9,000 / Ton

12.

Infrastucture fees for electricity Charge

12.5% on Item-10

12.5% on Item-10

12.5% on Item-10

12.5% on Item-10

 

 

Item

No

Particulars

Charges (Kyat)

Theinbyu Dock-yard

Setsun Drydock

Angyi Dock-yard

Dagon(Seikan) Dock-yard

13.

Air Bag Usuage Charge

 

 

 

 

 

(a)15 m Length

Kyats 100,000/ Unit-Duty

Kyats 100,000/ Unit-Duty

Kyats 100,000/ Unit-Duty

Kyats 100,000/ Unit-Duty

 

(b) 10 m Length

Kyats 80,000/  Unit-Duty

Kyats 80,000/ Unit-Duty

Kyats 80,000/ Unit-Duty

Kyats 80,000/   Unit-Duty